Hi all!
So we have been SO behind on our posts... The pictures below are from 1.5 weeks ago, and it shows that we have no more holes in the floor! The covered areas were for the sewer piping.
**Other new things with the house... The 220 sq. ft of the kitchen addition was prepped last week (These pictures were taken 11/2/09). The rebar job got approved by an inspector... and as of today, concrete was poured in this area! After the concrete gets poured, the guys will be able to frame the addition.
...More pictures to come this weekend... The bad part of not having a flexible day schedule is that I'm not able to go "see" the house when I want, and take pictures when exciting things like concrete get poured...... Oh, the things that make me happy. haha.